Location | Kefalonia-City (Kefalonia Prefecture) |
Price | 2.500.000 € |
Realtor commission | 2 % +VAT (if applicable) |
Living Area | 1700 m² |
Type | Commercial property For sale |
Bathrooms | 35 |
WC | 5 |
Floor | Basement |
Levels | 3 |
Year built | 1985 |
Heating | No heating |
Energy class | |
Realtor listing code | HOTEL LIXOURI |
Listing published | |
Listing updated | |
Distance to center | 300 meters | Distance to port / airport | 300 meters | ||||
Access by | Asphalt | Zone | Residential | ||||
Orientation | East | Parking space | No |
View | Newly built | ||
Air conditioning | Furnished | ||
Parking | Garden | ||
Pets allowed | Alarm | ||
Holiday home | Luxury | ||
Satellite dish | Internal stairway | ||
Elevator | Storage room | ||
Veranda | Pool | ||
Playroom | Fireplace | ||
Solar water heater | Loft | ||
Safety door | Penthouse | ||
Corner home | Night steam | ||
Floor heating | Preserved | ||
Neoclassical |
The building consists of a basement, a ground floor raised by 1.8 meters from the ground, A floor, B floor and a roof. The area of each floor is 410 sq.m. about. On the ground floor, the A floor and the B floor are the areas of main use of the hotel. In the basement there are: breakfast kitchen, central engine room, fire extinguishing and central air conditioning systems, elevator engine room, shared w.c. men's/women's, warehouses and laundries as well as an additional single space of 300 sq. m. about. On the ground floor there are: reception areas, breakfast room, bar, office and rooms. On the floors there are rooms, linen closets and storage areas. On the roof there are: linen closets and storage areas. The hotel has 35 rooms and two elevators. The building consists of a load-bearing anti-seismic body of reinforced concrete with a foundation of a general layer of sufficient thickness (radiere) with reverse trussing and monoblock walls throughout the height of the building for maximum anti-seismicity. The walls are made of optical brickwork with lime-cement mortar coating. The floors are covered with marble and ceramic tiles. Also, the building has a cage lightning rod for lightning protection. Construction work was completed in August 1985. In 2014, a radical renovation took place.